
The bridge to the 10th tee has been replaced with new sleepers and lowered a little to enable a smooth crossing. A large amount of concrete was also placed under each end of the bridge where water had eroded under the concrete. Green staff have also removed the unsightly garden bed behind the tee and will also remove the small bed immediately beside the tee.
No comments:
Post a Comment