- Removal of existing contaminated sand
- Enlarging the bunker slightly so the bunker rake can get in and out easily
- Raising the base level of the bunker to enable easier access
- Raising of the turf on the green side to prevent water run-off
- Installation of new drainage using MegaFlo drainage pipe
- Installation of bunker mat on the faces to reduce contamination of the sand
- New sand added
- Turf relaid around the edges
The boys have done a great job on this bunker and with some heavy rain since this work has been completed the bunker has drained magnificently.
Work clearing the drainage lines on the back left bunker on 13 was also carried out enabling this bunker to drain more quickly.
Work being carried out on bunker front right of 13 |
MegaFlo drainage pipe |
MegaFlo drainage pipe is flat with a covering that prevent sand and silt entering the pipe. This can be laid flat on the base of the bunker in a shallow trench eliminating the need to use a trencher to cut drainage lines. There is also no need to use any gravel which can contaminate the sand over time.
Work is now being carried out on the 2 bunkers on the first as they both drained poorly and needed some re-shaping. I will provide a further update on these when completed.